Kerneos decided to equip its plant in West Thurrock, 35 km east of London, UK with a new kiln burner. A TEC Greco obtained the project and started to investigate the special kiln and process conditions. As part of this study, a CFD (Computational Fluid Dynamics) modelling was conducted. The results of this study and the client’s specific requirements regarding thermal profile distribution inside the kiln led to a tailor-made kiln burner design. The new A TEC Greco kiln burner, the burner-fuel management system and the peripheral equipment will be commissioned during the summer kiln stoppage...
Kerneos decided to equip its plant in West Thurrock, 35 km east of London, UK with a new kiln burner. A TEC Greco obtained the project and started to investigate the special kiln and process conditions. As part of this study, a CFD (Computational Fluid Dynamics) modelling was conducted. The results of this study and the client’s specific requirements regarding thermal profile distribution inside the kiln led to a tailor-made kiln burner design. The new A TEC Greco kiln burner, the burner-fuel management system and the peripheral equipment will be commissioned during the summer kiln stoppage 2013.
